top of page
AER-whatsapp.png
Greyblue-faded-background-One-.jpg
hero correct.jpg
ARABIAN EQUIPMENT 

OUR PROJECTS

AER-Grey-blue-gradient-footer-.jpg

A LEGACY OF EXCELLENCE.

AER has proudly collaborated with prominent clients on many prestigious projects across the Middle East.

Our extensive expertise and dedication to quality have enabled us to play a key role in shaping the region’s most renowned developments, delivering innovative dewatering solutions that meet the highest standards of performance.

Greyblue-faded-background-.jpg
Qatar pearl islands AER Arabian Equipment

CONTRACTOR:
Rumaillah


PROJECT BRIEF:
200 6” FMX150i Pumps


SCOPE OF WORK:
Dewatering and water sumping

PEARL ISLANDS

QATAR

For the Pearl Island project in Qatar, our team successfully managed the site’s dewatering and water sumping needs by utilizing 200 powerful FMX150i pumps.

 

This operation was essential to maintaining a dry and secure work environment, ensuring the project’s progression without disruptions.

 

Our involvement highlights our capability to deliver reliable water management solutions for large-scale developments.

Greyblue-faded-background-One-.jpg
small-site-pic.jpg

FERRARI WORLD
ABU DHABI, UAE

An iconic developement in the heart of Yas Island, Abu Dhabi. 

At Ferrari World Abu Dhabi, we played a crucial role in managing the complex construction of five 1.2km tunnels at a 20m depth, two sports yards, and Ferrari truck race buildings. Our team expertly handled various dewatering and groundwater control methods, ensuring the site remained dry and safe throughout the construction process. This project demonstrates our capability to manage challenging conditions while delivering results.

CONTRACTOR:
Besix

PROJECT BRIEF:

Excavation depth up to -22m with 125,000.00m2 area

SCOPE OF WORK:

Various kinds of dewatering and groundwater control methods

Ferrari World.jpg

ACROSS THE MIDDLE EAST.

These projects highlight just a small portion of the work we've done, showcasing our team's commitment to delivering tailored solutions.
Each project reflects our expertise and dedication to meeting the unique needs and challenges of our clients.

Greyblue-faded-background-.jpg
doha international.jpg

At the New Doha Airport project in Qatar, we executed a critical operation for a 500m x 300m area near the sea. Our team efficiently managed the dewatering for the open excavation zone, spanning 100m x 200m. This ensured a stable and secure foundation, contributing to the successful completion of this high-profile infrastructure project.

 

The technical and precise work carried out highlights our dedication to delivering top-notch solutions in challenging environments.

DOHA AIRPORT
QATAR

'The technical and precise work carried out highlights our dedication to delivering top-notch solutions in challenging environments.'

CONTRACTOR:
CDC-Takenaka JV

PROJECT BRIEF:
Secant pile shoring for area 500m x 300m close to the sea. Open excavation area 100m x 200m

SCOPE OF WORK:
Dewatering and water sumping

Greyblue-faded-background-One-.jpg
yas.jpg

YAS RACETRACK
ABU DHABI, UAE

Yas Marina Circuit is a world-class Formula 1 racetrack located in Abu Dhabi, UAE.

At the Yas Island Race Track project, we were tasked with managing the dewatering and groundwater control for the construction of five 1.2km tunnels, each at a 20m depth, along with two sports yards and Ferrari truck race buildings. Our expertise ensured that the underground work proceeded smoothly, keeping the site dry and secure. This project showcased our ability to handle complex water management challenges in large-scale infrastructure developments.

CONTRACTOR:
Cebarco
Tilke Gmbh & Co


PROJECT BRIEF:
Five tunnels each 1.2km, 20m depth, two sports yards & Ferrari truck race buildings

SCOPE OF WORK:
Various kinds of dewatering and groundwater control methods

YAS.jpg
Greyblue-faded-background-.jpg
Hyatt-Grand-Doha-Swimming-Pool-Twilight.jpeg (1).jpg

We successfully completed the New Grand Hyatt Doha project by providing an exceptional dewatering system that met the highest standards.

 

Our responsibilities included the construction of well-designed trenches and a reliable French Drain system, along with the installation of submersible pumps to ensure effective water management. Additionally, we carried out sump trenching with precision, ensuring the project’s structural integrity and safety throughout the construction process.

GRAND HYATT
QATAR

CONTRACTOR:
Al Majal Contracting

PROJECT BRIEF:
Dewatering system with trenches, french drain system including submersible pumps

SCOPE OF WORK:
Sump trenching

Whatever the job scope, AER has the range and expertise to master
any Dewatering Project across the Middle East.

TRUST, EXPERTISE. JOB DONE.

grayscale-vertical-shot-seawater_edited.jpg
Greyblue-faded-background-three-.jpg

A HIRE POWER.

We have built a reputation for excellence in the construction industry, delivering high-quality projects that meet the highest standards of safety, quality, and environmental sustainability.

 

Our commitment to excellence is underscored by our ISO certifications, ensuring that our pump rental and dewatering services adhere to internationally recognized premium standards.

AER-ISO-9001-2015-Pic.jpg
AER-ISO-45001-2018-Pic.jpg
AER-ISO-14001-2015-Pic.jpg
bottom of page